Dr. Hussein Elarabi

Dr. Hussein Elarabi

BRRI, UofK

  • Personal Data
  • Educational Qualification:
  • Practice
  • Awards and Honors
  • Vocational Activities
  • Areas of Expertise
  • General Research Fields
  • Professional Experience
  • Publications
  • Conferences Attendance
  • Manuscripts Submitted
  • Special Technical Studies
  • Computer Software
  • Contracting Experience
  • Filed/Laboratory Testing
  • Voluntary Works

Contracting Experience

Associated in execution of the following projects as a site engineer:

  • Public Defense Head office Building: One story building.
  • House at Shambat, Bahri town: consist of 3 floors (1987-1988).
  • Three story building at Elsafia (1987-1988).
  • Villa at Riyadh, Khartoum: consist of 3 floors (1987-1988).
  • Construction of the Intersection area of Airport Street and Hospital Street (June 1989-Dec. 1989).
  • Four story building at Elriyad, for private sector (1988-1990).
  • Surrounding decorated wall Ministry of Religion affair (during 1990)
  • Helton Fountain structure: The water spring up to 18 meter high.
  • Maintenance of Helton Khartoum during the period Jan.1991-Sept. 1992.
  • Maintenance of Meridian Khartoum during the period Jan.1991-Sept. 1992.
  • Dreams Tower Company buildings more than 10 multi story Buildings.
  • Sanitation system for the Chinese embassy at Khartoum- Sudan.
  • Many contributions in soil mechanics testing and geotechnical investigation of much representative engineering work (MORE THAN
  • 400 SITES) like bridges and roads has been done in the life time of the company.
  • Redesign and execution of more than 400 prefabricated houses.
  • Supervision for 8 villages includes 800 houses in Red Sea State.
  • Execution of more than 20 Telecommunications Tower for Areeba, Mobitel, Sudani and Sudatel.