• Personal Data
  • Conferences
  • Computer Skills
  • Employment & Professional
  • Key Skills
  • Registrations
  • Representative
  • Publications & Presentations
  • Academic Qualifications

Publications & Presentations

 

  • Atkinson, L.C., Durbin, T.J., and Azrag, E.A., 1992, Estimating the effects of non-Darcian flow on inflow to a pit and slope stability: Preprint No. 92-156 of paper presented at 1992 Annual Meeting of Society for Mining, Metallurgy, and Explora­tion, Phoenix, Arizona, 4 p.
  • Azrag, E.A., Ugorets, V.I., and Atkinson, L.C., 1998, Use of a finite element code to model complex mine water problems: Preprint of paper to be presented at International Mine Water Association Symposium, Johannesburg, South Africa, September, 11 p.
  • Azrag, E.A., and Yousif, H., 1988, Use of natural coagulants in water supply treatment – a comparison study: Proceedings of Natural Coagulants Seminar, Indonesia.
  • Azrag, E.A., Durbin, T.J., and Nour El-Din, N.N., 1986, T­wo-dimensional simulation of solute transport by finite-element method: Microsoftware for Engineers, v. 2, n. 3, p. 171-180.
  • Azrag, E.A., Yagoub, I., and Abu Sin, M., 1987, Environmental Impact Assessment of the Application of the Hand-pump project in Western Sudan, A study presented to the United Nations International Children’s Emergency Fund (UNICEF), Khartoum, Sudan.
  • Azrag, E.A., 1983, Nitrogen removal mechanisms in overland flow wastewater treatment: M.S. thesis, University of California-Davis.
  • Azrag, E.A., 1987, Management of Aquifers versus Hydraulics and Solute Transport: Ph.D. Dissertation, University of California-Davis.
  • Hanna, T.M., Azrag, E.A. and Atkinson, L.C., 1994, Use of an analytical solution for preliminary estimates of ground-water inflow to a pit: Mining Engineering, v. 46, no. 2, p. 149-152.
  • Horner, Jim, Azrag, E.A., et. al., 1997, Application of Renewable Energy in Rural Water Supply, NREL, Golden, CO.
  • MacDonald, A., and Azrag, E.A.,2002, Predicting Ground-Water Inflow to an Underground Mine beneath a Lake in Northern Canada, paper will be presented at 2003 Annual Meeting of Society for Mining, Metallurgy, and Explora­tion.
  • Akber, Mukhopadhyay, E. Azrag, E. Al-Awadi, A. Al-Haddad,H. Al-Qallaf (KISR No. 8533) “Distribution and Source of Nitrogen Compounds in the Groundwater of Kuwait (WM002C)” Journal of Applied Geochemistry (under review).
  • A Fadlelmawla, E. Azrag,” Simple Yet Significant: Water Auditing as Demand Management Tool” 7th Gulf Water Conference “Water in the GCC-Towards an Integrated Water Resources Management”, 19-23 November, Kuwait 2:871-880.

Technical Reports (KISR years 2003-2007 )

  • E. Azrag, D. Pearson, J. Al-Kandari“Estimation of Leakage from the Freshwater Network in Kuwait (WM024C)”, Confidential, Final Report, December 2007.
  •  E. Azrag and M. Al-Otaibi,“Development of Water Code of Practice for Internal Plumbing in Kuwait (WM023C), Confidential, Final Report (KISR No. 8838), July 2007.
  • M. Al-Otaibi, A. Fadlelmawla, E. Azrag, K. Hadi, M. AlSenafy,“Optimum Utilization Strategy for the Fresh Groundwater Lenses at Raudhatain Field, Phase II (WM017C)”, Restricted, Final Report (KISR No. 8672), April 2007.
  • M. Al-Otaibi, A. Fadlelmawla, E. Azrag, K. Hadi, M. AlSenafy,“Optimum Utilization Strategy for the Fresh Groundwater Lenses at Raudhatain Field, Phase III (WM017C)”, Restricted, Final Report (KISR No. 8672R), November 2007.
  • A. Fadlelmawla, E. Azrag, A. Haji, H. Ghoneim, A. Al-Khalid, H. Naseeb “Initiating Water Auditing at KISR (WM018K)”, Restricted, Final Report (KISR No. 7745), June 2005.
  • A. Al-Haddad, A. Mukhopadhyay, E. Azrag, M. AlSenafy, H. Ghoneim, A. Al-Khalid, K. Al-Fahad “Investigations on the Occurrence of Hydrogen Sulfide in the Groundwater of Kuwait City (WM013C), Confidential, Final Report (KISR No. 7986), January 2006.
  • F. Székely, M. Al-Otaibi, A. Mukhopadhyay, E. Azrag, M. Al-Murad “Computer Analysis of the Impact made by Wells on Aquifer Systems in Kuwait (WM007C)”, Restricted, Final Report (KISR No. 7157), May 2004.
  • M. Al-Senafy, A. Fadlelmawla, K. Al-Fahad, A. Al-Haddad, A. Al-Khalid, E. Azrag, K. Hadi “Assessment of Potential Groundwater Contamination and Associated Environmental Impacts at PIC Plants in Shuaiba, Kuwait (WM015C)”, Confidential, Final Report (KISR No. 7376), November 2004.
  • A. Mukhopadhyay, E. Al-Awadi, E. Azrag, T. Rashid, H. Al-Qallaf, H. Ghoneim “Assessment of Groundwater Pollution from Oil Fires and Evaluation of Remedial Procedures (WH019C)” – Final Report (KISR No. 7434), December 2004.
  • M. Al-Senafy, E. Azrag, A. Al-Khalid “Assessment of Groundwater at the Hunting and Equestrian Club (WM003S), Restricted, Final Report (KISR No. 6962), November 2003.

Technical Reports (Selected From HCI Years 1997-2001 ):

  •    Hydrologic Consultants, Inc., 2001, PREDICTED QUANTITY OF WATER DISCHARGE FROM SNAP LAKE MINE, report prepared for AMEC Simons Mining and Metals Vancouver, British Columbia, October.
  •     Hydrologic Consultants, Inc., 2001, 2001 UPDATE OF NUMERICAL GROUND-WATER FLOW MODELING FOR McCOY/COVE MINE LANDER COUNTY, NEVADA, report prepared for Echo Bay Minerals Company McCoy/Cove Mine Battle Mountain, Nevada, November.
  •   Hydrologic Consultants, Inc., 2001, Conceptual hydrogeologic model and ground-water flow modeling of Grasberg mine and surrounding area Addendum VI DESCRIPTION OF 2001 UPDATED AND EXTENDED REGional Ground-Water Flow Model, report prepared for P.T. Freeport Indonesia Tembagapura, Indonesia, November.
  • Hydrologic Consultants, Inc., 2001,”NUMERICAL MODELLING PREDICTIONS OF POTENTIAL EFFECTIVENESS OF DEWATERING FOR BLOCKS 4 AND 5 FINSCH MINE, reportprepared for KLM Consulting Services (Pty) Ltd. Lanseria, Republic of South Africa, April.
  • Hydrologic Consultants, Inc., 2000, PREDICTED DEWATERING REQUIREMENTS FOR RE-OPENING OF CROCODILE RIVER MINE AND ASSOCIATED HYDROLOGIC MPACTS, report prepared for KLM Consulting Services Lanseria, Republic of South Africa, October.
  •   Hydrologic Consultants Inc. Of Colorado, 2000, PREDICTION OF FATE AND EXTENT OF CYANIDE EMANATING FROM PIÑON TAILINGS IMPOUNDMENT AT TWIN CREEKS MINE, report prepared for Newmont Mining Corporation, September.
  •   Hydrologic Consultants, Inc., 1999, 1999 UPDATE OF HYDROGEO-CHEMICAL MODEL AND PREDICTION OF CHEMICAL COMPOSITION OF COVE PIT LAKE LANDER COUNTY, NEVADA, report prepared for Echo Bay Minerals Company McCoy Mine Battle Mountain, Nevada, August.
  •   Hydrologic Consultants, Inc., 2000, 1999 UPDATE OF NUMERICAL GROUND-WATER FLOW MODELING FOR NEWMONT MINING CORPORATION’S LONE TREE MINE HUMBOLDT COUNTY, NEVADA, report prepared for Newmont Mining Corporation, January.
  • Hydrologic Consultants, Inc., 1998, CONCEPTUAL HYDROGEOLOGIC MODEL AND GROUND-WATER FLOW MODELING OF GRASBERG MINE AND SURROUNDING AREA IRIAN JAYA, INDONESIA ADDENDUM III Detailed Simulation of Grasberg Pit Area for Design of Dewatering and as Hydrologic Input to Slope Stability Analysis HCI-867 Prepared for P.T. Freeport Indonesia Tembagapura, Indonesia October.
  •   Hydrologic Consultants, Inc., 1998, 1998 ANNUAL UPDATE OF GROUND-WATER FLOW MODEL FOR LONE TREE MINE, report prepared for Newmont Gold Company, October.
  •   Hydrologic Consultants, Inc., and Pells Sullivan Meynink, Australia, 1998, AN INTEGRATED SURFACE-WATER AND GROUND-WATER STUDY OF 240K MILL WATER SUPPLY, report prepared for P.T. Freeport Indonesia Tembagapura, Indonesia, June.
  •   Hydrologic Consultants, Inc., 1998, CONCEPTUAL HYDROGEOLOGIC MODEL AND GROUND-WATER FLOW MODELING OF GRASBERG MINE AND SURROUNDING AREA IRIAN JAYA, INDONESIA ADDENDUM II Detailed Simulation of East Ertsberg Underground Mining and Dewatering, report prepared for P.T. Freeport Indonesia Tembagapura, Indonesia, February.
  •   Hydrologic Consultants, Inc., 1997, CONCEPTUAL HYDROGEOLOGIC MODEL AND GROUND-WATER FLOW MODELING OF GRASBERG MINE AND SURROUNDING AREA IRIAN JAYA, INDONESIA ADDENDUM I, December.
  •   Hydrologic Consultants, Inc., 1997, Update of Model including Simulation of 300k Mine Plan and Mill Water-Supply Alternatives, report prepared for P.T. Freeport Indonesia Tembagapura, Indonesia, December.
  •   Hydrologic Consultants, Inc., 1997, CALIBRATION OF GROUND-WATER FLOW MODEL FOR THE SACRAMENTO RAIL YARD, report prepared for Union Pacific Railroad October.

Selected Technical Memorandum (Selected From HCI Years 1998-2002 ):

  • DATE:            11 September 2002

SUBJECT:      Statistical Analysis of Particle Tracking Simulations and Predicted Changes in Net Outflow from Northern Lakes

  • DATE:            29 August 2002

SUBJECT:      Updated Ground-Water Flow Model of Snap Lake Diamond Project and Predicted Post-Closure Flow Away from Mine Based on Particle Tracking

  • DATE:           30 July 2002

SUBJECT:      Response to Information Requests Snap Lake Diamond Project

Environmental Assessment Report

  • DATE:           17 May 2002

SUBJECT:      Response to Information Requests

  • DATE:            18 March 2002

SUBJECT:      Interpretation of Pumping Test in Kimberlite at Venetia Mine

  • DATE:            6 March 2002

SUBJECT:      Assessment of Spinner Logs of LDD Wells 173, 174, 176, and 177 on 65 Level at Finsch Mine

  • Date:               21 January 2002

Subject:           Analysis of Step-Drawdown Data from Finsch Mine

  • DATE:            6 July 2001

SUBJECT:      Preliminary Estimates of Inflow to Snap Lake Mine – Expansion Case

  • DATE:            9 July 2001

SUBJECT:      Revised Estimates of Inflow to Snap Lake Mine       Expansion Case

  • DATE:                        6 July 2001

SUBJECT:       Preliminary Estimates of Inflow to Snap Lake Mine – Expansion Case

  • DATE:            28 June 2001

SUBJECT:      Snap Lake Ground-Water Inflow Model

  • DATE:            4 April 2001

SUBJECT:      Design of Aquifer Test at 25 Bypass on 763 Level at Premier Mine

  • DATE:            24 October 2000

SUBJECT:      Description of Model Used to Estimate Passive Inflow to Montcalm Mine

  • DATE:            20 October 2000

SUBJECT:      Estimate of Inflow to Proposed Montcalm Mine

  • DATE:            June 7, 2000

SUBJECT:      Updated Predictions of Dewatering Requirements for McCoy/Cove Mine

  • DATE:            June 16, 1999

SUBJECT:      Predicted Effects of Phased Shutdown of Pumping at Cove Pit

  • DATE:            14 January 1999

SUBJECT:      Proposed Ground-Water Flow Modeling for Finsch Mine

  • DATE:            31 December 1999

SUBJECT:      Calculated Hydrologic Budgets within Portions of Hydrologic Study Area

  • DATE:            25 May 1999

SUBJECT:      DRAFT – Recommendations for Installing Flumes in Underground Workings

  • DATE:            19 February 1999

SUBJECT:      Proposed Methodology for Predicting Water Quality of Discharge from Carstenszweide Drainwells

  • DATE:            11 February 1999

SUBJECT:      Differences Between Model-Predicted and Currently Measured

Ground-Water Discharges

  • DATE:            June 5, 1998

SUBJECT:      Description of Loop Structure within MINEDW