• Personal Data
  • Qualifications
  • Affiliations
  • Positions Held
  • Academic Experience
  • Publications
  • Professional Experience

Professional Experience

. Design of the” Rainfall Drainage Network for the National Capital(Khartoum, Omdurman & Khartoum North )”,

   Consulting Firm : Agib-Howard Humpherys Joint Venture, 1991

Client: Ministry of Engineering Affairs, Khartoum State

 

2. Design of the” Drainage Structures for El-Renk – Malakal Road “, (330 km) ,1997

Consulting Firm : Stippe-Techncon Joint Venture

Client: Ministry of Highways & Transportation

 

  1. Design of the” Drainage Structures for El-Renk – Jabalein l Road “, (158 km), 1998

Consulting Firm : Techncon

Client: Ministry of Highways & Transportation

 

4. Design ,in participation with other colleagues, of the” Drainage Structures for En Nuhud-Rigl elFula-ElMuglad Road “, (230 km), as a consultant for University of Khartoum Consultancy Corporation ,1998

Client: Ministry of Highways & Transportation

 

5. Design of the” Rainfall Drainage Network for Singa town”, as a consultant for El-Dar El-Estisharia

Client: Ministry of Engineering Affairs, El-Gadarif State

 

  1. Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of

Tama Irrigation Scheme :This is a 6000 Feddan scheme on the Blue

Nile near Karkooj (Blue Nile State), 1992

Client: Ministry of Engineering Affairs, Sennar State

 

 

  1. Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of Soba West Irrigation Scheme : This is a 2700 feddan Scheme on the Blue Nile, , 1990 .
  2. Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of Sanabil Scheme : This is a 22000 feddan scheme on the eastern bank of the Blue Nile near Um Dawanban (Khartoum State), 1993.

Client: Khartoum University

Client: Sanabil Cooperative Committee

 

  1. Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of ElMultaga Agricultural Scheme : This is a 15000 feddan scheme on the eastern bank of the Blue Nile near El-Daba (Northern State),

     Consulting Firm : University of Khartoum Consultancy Corporation.

     Client: Merowe Dam Project ImplementationUnit,1999.

 

  1. Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of Mokabrab Agricultural Scheme : This is a 60 000 feddan scheme on the eastern bank of the River Nile near ElDamar (Nile State),

Consulting Firm : University of Khartoum Consultancy Corporation.

   Client: Merowe Dam Project ImplementationUnit, 2000.

 

  1. Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of New Amri Agricultural Scheme : This is a 35000 feddan scheme on the western bank of the Blue Nile near Korti (Northern State),

   Consulting Firm :University of Khartoum Consultancy Corporation

   Client: Merowe Dam Project ImplementationUnit ,2003.

 

  1. Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of Kiheila Agricultural Scheme : This is a 45 000 feddan scheme on the eastern bank of the River Nile near Abu Hamad (Nile State),

Consulting Firm : University of Khartoum Consultancy Corporation.

Client: Merowe Dam Project ImplementationUnit, 2005.

 

  1. Design, in participation with other colleagues, of “ El-Gadarif Water Supply Scheme”,(1994) , which include the following :

i) design of a 66 km long pipeline with a pump station

ii) design of a water reservoir at the outfall of a small stream

iii) design of an earth dam with deep sluices and a spillway

Client: Ministry of Engineering Affairs, El-Gadarif State

 

  1. ” Design of Jabel Marra Hydropower & Water Supply Scheme by utilizing three waterfalls in the Marra mountain”,

Client: Ministry of Engineering Affairs, South Darfur State

 

 

15. Development, in participation with other colleagues, of “ Ground Water Mathematical Model for El-Gadarif Aquifers” ,(1997)

Client: Ministry of Engineering Affairs, El-Gadarif State

 

16. Design, in participation with other colleagues, of “ Wadi Gabatit

(Red Sea State) Water Supply Scheme”,(1997) , which inculde the

following :

i) design of a 15 km long pipeline

ii) design of an underground dam

iii) design of an earth dam with a spillway

Client: Ministry of Engineering Affairs, Red Sea State

 

17. Design, in participation with other colleagues, of “ Wadi Moj (Red Sea State) Water Supply Scheme”,(1999) , which include the   following :

i) design of a 12 km long pipeline

ii) design of an earth dam with a spillway

Client: Ministry of Engineering Affairs, Red Sea State

 

18. Design,in participation with other colleagues, of “ Sudd El-Daiga (Khartoum State) Water Supply Scheme”,(1999) , which inculdes

the design of an earth dam with a spillway

Consulting Firm : University of Khartoum Consultancy Corporation.

Client: Ministry of Engineering Affairs, Khartoum State

 

19. Design, in participation with other colleagues, of “ Wadi El-Mugadam (Khartoum State) Water Harvesting Scheme”,(1999) , which inculdes the design of an earth dam with a spillway

Consulting Firm : University of Khartoum Consultancy Corporation.

Client: Ministry of Engineering Affairs, Khartoum State

 

20. Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of “The Bioremediation Project”, at Hegleig Oil Field, 2000.

Consulting Firm : Solar Enterprises Company

Client: Greater Nile Petroleum Operating Company

21. Supervision of Construction of the Canalization System, Drainage System, Irrigation structures and Pump Stations of ElMultaga Scheme: This is a 15000 feddan scheme on the eastern bank of the Blue Nile near ElDaba (Northern State), 2002.

Consulting Firm : University of Khartoum Consultancy Corporation.

     Client: Merowe Dam Project ImplementationUnit.

 

22. Design ,in participation with other colleagues, of the Evaporation Ponds ,Canalization System, Drainage System, at Bamboo, Toma South, ElToor, ElHar-ElNar, Munga and Unity Oil Fields, 2002.

Consulting Firm : Solar Enterprises Company

Client: Greater Nile Petroleum Operating Company

23. Design ,in participation with other colleagues, of the Evaporation Ponds ,Canalization System, Drainage System, at Khartoum Refinery, 2002.

Consulting Firm : Techneco Group

Client: Khartoum Refinery

 

24. Project Manager for the Supervision of Construction of the Canalization System, Drainage System, Irrigation structures and Pump Stations of New Amri Scheme: This is a 35000 feddans scheme on the eastern bank of the River Nile near Korti (Northern State), 2004-2007.

Consulting Firm : University of Khartoum Consultancy Corporation.

     Client: Dams ImplementationUnit.

25. Supervision of Construction of the Canalization System, Drainage System, Irrigation structures and Pump Stations of AlMokabrab Scheme: This is a 60000 feddans scheme on the eastern bank of the River Nile near AlDamer (Nile State), 2004-2007.

Consulting Firm : University of Khartoum Consultancy Corporation.

     Client: : Dams ImplementationUnit.

 

26. Supervision of Construction of the Canalization System, Drainage System, Irrigation structures and Pump Stations of Kehaila Scheme: This is a 45000 feddans scheme on the eastern bank of the River Nile near Abu Hamad (Nile State), 2006-2008.

Consulting Firm : University of Khartoum Consultancy Corporation.

     Client: Dams ImplementationUnit.

 

27.   Hydraulic Design of the” Drainage Structures for Kadogli-Lagawa- AlFoola Road “, (170 km), 2006

Consulting Firm : Techno Group

Client: Ministry of Highways & Transportation

28. Hydraulic Design of the” Drainage Structures for Kadugli – Higlieg Road with a length of 130 km and Mujlad – Abyei Road with a length of 220 km, 2009

Consulting Firm : Shouraconsult Company Ltd

Client: Ministry of Highways & Transportation

 

 

29. Team Leader for the “ Technical & Financial Feasibility Study of Al-Roseiris Irrigation Scheme”: This is a 200,000 feddans scheme on the eastern bank of the Blue Nile near Al-Roseiris (Blue Nile State), 2009.

Consulting Firm : University of Khartoum Consultancy Corporation.

     Client: Dams ImplementationUnit.

30.   “Water Resources Assessment (WRA) in Southern Sudan”, 2010.

Consulting Firm : University of Khartoum Consultancy Corporation.

     Client: Government of South Sudan.

31. Team Leader for the “ Technical & Financial Feasibility Study of Al-Shereik Irrigation Scheme”: This is a 40,000 feddans scheme on the eastern bank of the River Nile near Al-Sherik ( Nile State), 2010.

Consulting Firm : University of Khartoum Consultancy Corporation.

     Client: Dams ImplementationUnit

 

32. Team Leader for the” Design of the Drainage Structures for Baleela-Um Adara Road “, (98 km), 2012

Consulting Firm : University of Khartoum Consultancy Corporation.

Client: Petro-Energy Company

 

33. Team Leader for the” Design of the Drainage Structures for For Block 6 (Jake-Keyi-Sentaya and Muglad) “, (84 km), 2013

Consulting Firm : University of Khartoum Consultancy Corporation.

Client: Petro-Energy Company

 

34. Project Manager for the Supervision of Construction of the

” Drainage Structures for Baleela-Um Adara Road (Shalango Sector)”, EPCC Contractor: Sudan Pile -Jobdeliver, 2014-2015

Consulting Firm : University of Khartoum Consultancy Corporation.

     Client: Petro-Energy Company

 

35. Project Manager for the Supervision of Construction of the

” Drainage Structures for Jake-Keyi-Sentaya and Muglad “,

EPCC Contractor: Shandong, 2015.

Consulting Firm : University of Khartoum Consultancy Corporation.

     Client: Petro-Energy Company

36. Team Leader for the “ Technical & Financial Assessment Study of The Existing Irrigation 58 Schemes in Northern State, Nile State & Sennar State”: Total Area is 657,000, 2015.

Consulting Firm : University of Khartoum Consultancy Corporation.

     Client: Ministry of Finance

37. Hydrologic and Hydraulic Design of the” Drainage Structures in Delta Toker Scheme, Red Sea State”, 2015

Consulting Firm : University of Khartoum Consultancy

Client: Eastern Sudan Rehabilitation and Development Fund