Associate  Professor

Associate Professor

  • Personal Data
  • Academic qualifications
  • Professional qualifications & memberships
  • Recent work
  • Academic Work experience
  • Professional Work experience
  • Socio- academic Work experience
  • Professional Assignments
  • Professional Experience And Activities
  • Academic Activities

Professional Experience And Activities

1.1.   Brief Detailing of Some PROFESSIONALEXPERIENCE:

1983 – 1985 : As Architect Consultant Tadamon Bank : Design and supervision of Bank branches in Gedarif , Managil , Omdurman , Sinnar , Karima , Nyala , and the upper floors in Parlaman Branch .

1983 – 1988 : Undersecretary, then Head of the Technical Committee for design and supervision of Ailafoon , Eastern Nile National Stadium (60,000 seat ).

1989 : Civic design of old Ankara CBD, (Ulus ) Hagi Bayram area. (alternative Urban Design Project).

1986 – 1996 : Partner and co-founder of A.S. Architects Planners Consultancy : Design and supervision of more than 50 projects .

1983 – 1997 : Consultant Engineer for Tayseer Transport Company , IBRO Company and Packaging House Sudan .

1993 – 2005 : General Manager, Partner and co-founder of SINAN ENGINEERING GROUP Consultancy, Architects & Planners: Design and supervision of hundreds of projects .

 

1.2.   1981 -1993: As Senior Architect / Planner, Ministry of Housing & EngineeringUtilities:

Works includes but not exclusive to: Team member, Planning & Urban Design project of Kafori township. Planning Marawi Town after 1981 floods. Re-planning & Restructuring project of Khartoum North Industrial Area. Re-planning Eastern Nile Villages (Principal planner). Omdurman squatter housing projects. Housing urban poor projects Khartoum North.

 

1.3.   1993 – 2005 : As General Manager SINAN Engineering Group, and after:

  • Design and supervision of more than 100 projects including urban & regional planning, residential, commercial and industrial projects, e.g.Trade Union Headquarters. Herman Gimiener ChildrenVillages.

1995-2003: Consultant for Abdel Momeim Mohamed Trusts.

1995- 2003: Consultant foe SOS International Children Village Organization.

1998-2003 : Architect Consultant & Project management for Shell company – Sudan. Design, rehabilitation, supervision and management of all Petrol Stations and Depos.

  • Sawakin Town master plan (1993-2013) Red Seastate-
  • Sinkat Town master plan and regional study (1995-2015) Red SeaState.
  • Tokar master plan 2001. (Planning Team Leader).
  • Singa master plan (1993-2013) Sinnar State , . (planning Team Leader).
  • Sinnar structure plan (1997-2020) Sinnar State . (planning Team Leader).
  • Kadogli Town + Dalang Town + Didaibat Town master plans + and regional study for Southern Kordofan State. (1993-2013) (planning TeamLeader).
  • Port Sudan CBD urban design projects(3projects).
  • Dongola Town master plan (1999-2013) (planning Team Leader) . NorthernRegion.
  • Merawy City master plan,+ Kareema City master plan (2003-2023) .Shamalya State. (Planning TeamLeader).
  • Master plan for Deleng University ( Southern Kodrufan Region). (Principalplanner).
  • Master plans for Heglig Town + and Unity Town . South Kordofan State – Sudan. (Principal planner) .
  • Structure plan for Bentiue City, Rabakona City, Fuash City, Thuann City, and Tong City. Plus Regional plan for Unity State : ( 2003-2023). (Principalplanner).

 

1.4.   2006- 2009 : combined works with UNHABITAT:

As Khartoum State representative, and as independent consultant collaborated UN Habitat in several oriented researches, capacity building activities, and publications. Includes:

  1. Capacity building programs for planners & Engineers in Sudan andEgypt.
  2. Capacity building training for Khartoum urban Observatorymembers.
  3. Training program for trainers for using Stabilized Soil Blocks SSB technology, and importing 100machines.
  4. As a member within a committee of three, we published the followingstudies:
    1. Diagnostic Studies on Urban Sectors – Khartoum State –   256pages.
    2. Pro-poor policies within Khartoum State – 60pages.
    3. Urban planning & development in Sudan & Khartoum State – 24pages.
    4. Capacity Building Assessment & Action plan – Ministry of Planning & Public Utilities –   54pages.
    5. Monitoring & Evaluation Framework for Khartoum Structural Plan – 26pages.
    6. Arabic Summary of Sec tor Assessment & Capacity Building of Khartoum State. 110pages.
    7. English Summary of Sector Assessment & Capacity Building of Khartoum State. 70pages.
    8. ….khartoum

 

1.5.2010- 2013 : as Deputy Secretary General & Project Manager : Unity Support Fund, of the Presidency:

Works is concentrated on the ten Border States between South Sudan and North Sudan. Includes architectural designs, urban planning, project management and managing supervision, and ad hoc planning solutions to newly settled congregation of displaced. Worksincludes:

  • Normative and standard design for rural health care facilities. At three levels. Complete and comprehensive set of drawings. (Principal designer & projectmanager).
  • Normative and standard design for rural primary education complex. Includes school, staff residence sexes, headmaster residence, sport and cultural facilities. Complete and comprehensive set of drawings. Seven complexes in the South and 14 complexes in the North. Implementation to turn key. (Principal designer & projectmanager).
  • Normative and standard design for rural secondary education complex. Includes school, labs, student’s dormitory, staff residence, headmaster residence, sport and cultural facilities. Complete and comprehensive set of drawings. 13 complexes. Implementation to turn key. (Principal designer & projectmanager).
    • Infrastructure projects like storm water dams, potable water networks, water stations and pumps, and etc. in all ten Border States. (Design team member & projectmanager).
    • Design of Blue Nile State’s Legislative Council Hall. (Principal designer & project manager).
  • Design Project of Children Autistics Center. The first in Sudan. Khartoum State. (Principal designer & projectmanager).
    • Design Project of Jabal Awlya Dialysis Center. To international standard. (Principal designer & projectmanager).

 

1.6.   After 2013:

  • Damazin City structure plan. Capital of Blue Nile State. A project sponsored by UN – Habitat. (Planning teammember).
  • Roeseris City structure plan. Damp city at the Nile State. A project sponsored by UN – Habitat. (Planning teammember).
  • Urban design project of Nyala Main Bus Terminal Station. South DarfurState.
  • Urban design project of Nyala Main Crop Market and Strategic Storages. South Darfur State.
  • Planning project of Sagra Township, Northern Nyala residential extensions. South DarfurState.
  • Design project of JOSWE medical factory, Jordan Swedish Medical & Sterilization Co. Bagair, GeziraState.