• Personal Data
  • Overview
  • Education and Qualifications
  • Papers & Publications
  • Workshops
  • Awards, Prizes & Scholarships
  • Work Experience
  • Projects
  • Research Interests
  • Activities/Interests
  • Other Qualifications/Skills
  • Referees

Projects

Cooperated in the following feasibility studies/ Design /Tenders/Supervision Services

  • Project Coordinator for Bank of Khartoum [Corporate Department] Assets Evaluation (January 2009) [Retail Department since February 2008] . Over 400 Properties evaluated since 2008.
  • Project Coordinator for Alsalam Bank Assets Evaluation Firm (February 2009) -Now & Supervision for Residential & Commercial Construction Financed by Alsam Bank 2009 -Now .
  • Project Coordinator for Qatar National Bank (QNB), Byblos (Africa), Qatar Islamic Bank (QIB), Sudanese Arab Bank, Byblos (Africa) Evaluations (February 2009-Now).

2015-2016

  • Sayga Floor Mills Assets Registry Audit (Currently Undergoing)
  • Sayga Floor Mills Assets Revaluation (August 2015)
  • Wheeta Floor Mils Assets Evaluation (August 2015)
  • Shawamikh Pharmaceutical Factory, Techno-Economical Feasibility Study (July 2015)
  • Shanghai – Sudan Pharmaceutical Company Limited, New Expansion Lines, Techno-Economical Feasibility Study (Febtuary 2015)
  • Northen State Digital Investment Map update June 2015.
  • Sheikan Insurance Assets Evaluation (May 2015)
  • Dal Abuhamad Agriculture Project Evaluation (May 2015)
  • Sayga Dealers Assets Evaluation (2014- 2015)
  • Cornthia Hotel – Alfateh Tower Plot Evaluation (January 2015)

2012-2014

  • University of Khartoum, Faculty of Engineering Development Project, Financed by Islamic Development Bank Jeddah, Laboratory Equipment Acquisition 2012-2014
  • Tala Agriculture (Saudi Arabian Investment) Project Canal (7.5 Km)Construction, Design & Supervision (January 2013)
  • Algima Agriculture Canal Design (22.5 Km Distance for irrigation of 25,000 Feddans) [Currently Undergoing]
  • Sudanese Football Association Tower Feasibility Study (March 2014)
  • 6 Towers Residential Development Feasibility Study (January 2014).
  • Jacoob Steel Factory . assets evaluation (August 2014)
  • Almil 40 Agriculture Farm . assets evaluation (July 2014)
  • Holy Quran society Investment Tower Feasibility Study (June 2014)
  • Yashthoon Biscuits Factory assets evaluation (July 2014)
  • Five Commercial Buildings assets evaluation (June 2014)
  • Almil 40 Agriculture Farm . assets evaluation (May 2014)
  • Garden City Hotel assets evaluation (May 2014)
  • Umdoom Agriclture Project assets evaluation (May 2014)
  • Sagai Agriclture Project assets evaluation (May 2014)
  • Mc Nimr Commercial Buildings assets evaluation (June 2014)
  • El-Salha University Hospital Ministry of Health- Khartoum State & Omdurman Islamic UniversityTechno-Economical Feasibility Study (June 2014)
  • Alnsari 600 Fennan Animal production and Agriculture Project Feasibility Study (April 2014)
  • Street 15 Commercial Buildings assets evaluation (June 2014)
  • Souq Omdurman Commercial Building evaluation (March 2014)
  • Prince Factory for Potato Chips assets evaluation (June 2014)
  • Cornthia Hotel – Alfateh Tower Plot Evaluation (February 2014)
  • QNB Tower Plot Evaluation (February 2014)
  • Libyan Arab Foreign Investments Co. assets evaluation (January 2014)
  • Alshaab Agriculture Project assets evaluation (March 2014)
  • BNA Agriculture Project- Northern State Assets evaluation (February 2014)
  • Dal Eilfon Dairy Project Assets evaluation (January 2014)
  • Dal Sutrac Assets evaluation (January 2014)
  • Sudanese German Factory for Diary, Juice and Food Products (January 2014)
  • Arab Authority Plot Evaluation [October 2013)
  • Alansari Oil Factory Valuation [November 2013].
  • 5000 Feddan Agriculture Project Evaluation [September 2013).
  • Sayga Flour Mills Assets Valuation (April 2013).
  • Syaga Wheat Silos, PortSudan Evaluation (August 2013).
  • Sayga Wheat Silos Evaluation Assets Evaluation (August 2013).
  • Alferdous Flour Mills Assets, Dongola Valuation (May 2013).
  • DAL Motors & SUTRC Assets Valuation (March 2013).
  • DIB Capital (Dubai Islamic Bank) Assets in Alsunnut Valuation, March 2013
  • Evaluation of the Sudanese Kawaiti Hotel Company, Client: Ernest & Young (Bahrain) . Dec 2012
  • Dal Group Development Valuation   (Client: Dal Group), December 2012
  • PepsiCola Factory Valuation, December 2012
  • Alwaha Development Assets Valuation, February 2012
  • Ayoub Paints Factory (South Sudan) Techno Economical Feasibility Study Nov 2012.
  • Edward Plastic Factory (South Sudan) Techno Economical Feasibility Study Nov 2012.
  • Juba Cables Factory (South Sudan) Techno Economical Feasibility Study Nov 2012.
  • CocoCola Factory Valuation, February 2012.
  • Bank of Khartoum Headquarters & Parliament Branch Evaluation Client: BOK/ Financial Invesment Bank (November 2012).
  • Valuation of Two Highway construction Companies for Merger (Private Clients). [ March 2012]
  • Siga Animal Feed Factory Evaluation, September 2012
  • Alkermet Depot Valuation (Client: Alkermet Petroleum), May 2012
  • Almgtrbeen Unversity Southern Campus   Valuation, April 2012
  • Ready Mix Factory Feasibility Study (Client Police Social Fund)
  • Alansari Oil Factory Valuation 2011 & 2012.

2011

  • Dal Group Assets Evaluation Registry & Tagging Project, Dec 2011
  • Agriculture Project & Fertlizer Factory Valuation, Industrial Development Bank Oct 2011
  • International Union for Muslim Scholars Investment Tower Feasibility Study 2011
  • Private Schools Feasibility Study Client Almajzoub Charity Organisatiion, May 2011.
  • Exchange Bureau Branches Study. Client: Bank of Khartoum/ Algomia Exchange 2011.
  • Alwatnia, New Engineering College Development, Dec 2011.
  • Arab Poultry Production Company Assets Valuation, April 2011
  • DIB Capital (Dubai Islamic Bank) Assets in Alsunnut Valuation, February 2011
  • Reorganization of River Transport Corporation (Nile River Transport Company
  • Six Highway Companies Assets Valuation March 2011
  • Alsaha Real estate Development Feasibility Study and Valuation 2011.
  • Bank of Khartoum Assets Valuation Dec 2011, 2012 .
  • Khartoum State, Ministry of Finance, Assets Valuation, January 2011.
  • Highway Project Management / Construction Supervision (Client Bank of Khartoum / Jazeera State / Khartoum State [ Currently Undergoing]

o   Wad Saih Road (Jazeera State)

o   Amallig Road (Jazeera State)

o   Internal Roads Medani (Jazeera State)

o   Abugota Road (Jazeera State)

o   Hataab Maawa Road (Khartoum State)

o   Omderman Omgati Road (Khartoum State)

o   Alhugna Amdissa Road (Khartoum State)

  • MELTSHOP for STEEL BILLETS PRODUCTION (Edward Alasaad Industries) Techno-Economical Feasibility Study Jan 2011
  • Rafeef Pharamaceutical Feasability Study Private Clients November 2011
  • Altyab Elkhalifa Estate Evaluation August 2011

2010

  • Northen State Digital Investment Map, in Calloboration with Dar Consult Client: Northen State.
  • Berbier Cement Factory, Production Distribution Strategy Client: Danfodio Commercial.
  • Environmental Impact Assessment Study for Khartoum North Sewage Project Client: Khartoum State Sanitary Corporation (KSSC).
  • Private Schools Feasibility Study Client Almajzoub Charity Organisatiion.
  • Nile Petroleum Gas Distribution Study. Client Zebian Services.
  • Soriba / Fath Aleim (Egypt) Merger Study. Clients Saudi Sudanese Metal Industries Co. Ltd (SOREBA)
  • Khartoum Refinery Fixed Assets Evaluation, [April 2010], Client: Ministry of Energy & Mining.
  • Faculty of Engineering, Techno-Economical Feasibility Study Client: Nyala University
  • Faculty of Education, Techno-Economical Feasibility Study Client: Nyala University.
  • Faculty of Vetrinery Sciences, Techno-Economical Feasibility Study Client: Nyala University.
  • Centeral Laboratory, Techno-Economical Feasibility Study Client: Nyala University.
  • Faculty of Engineering, Techno-Economical Feasibility Study Client: Sudan University of Science and Technology.

2009

  • Saudi Sudanese Metal Industries Co. Ltd (SOREBA) Assets Evaluation, [December 2009].
  • Khartoum Refinery Fixed Assets Evaluation, [April 2009], Client: Ministry of Energy & Mining.
  • Ports Engineering Fixed Assets Evaluation, [April 2009], Client: Ports Engineering Co Ltd.
  • Faculty of Medicine, Techno-Economical Feasibility Study Client: Alfasher University.
  • Faculty of Nursing & Public Health, Techno-Economical Feasibility Study Client: Alfasher University.
  • Faculty of Engineering, Techno-Economical Feasibility Study Client: Alfasher University.
  • Commercial Building Riad, Design Client Private.
  • Omdurman New (4 Star) Hotel – Commercial & Recreational Centre, Architectural Design & Feasibility Study, September 2009, Client: Students National Welfare Fund.
  • Phoeinicia Hotel, Techno-Economical Feasibility Study, June, 2009.
  • Presidential Conference Hall, Techno-Economical Feasibility Study, July, 2009.
  • Arab Scientific Research Councils Headquarters Tower, Project Appraisal, Client: Arab Scientific Research Councils General Assembly.
  • Dalgo, Algaba, Algoleid & Alteraa Cities, Northen State , Re-planning Project.
  • Sudan Banking Sector Market Intelligence Study & Customer Satisfaction Nation Wide Survey June 2009.
  • FUCHS Grease Factory Fixed Assets Evaluation, February 2009, Client: Petrobash M.A. Co. ltd.
  • Market Study, Feasibility Study & Environmental Study for a New Paint Factory, November 2008 [January 2009], Client: EK Holding [Egypt]

2008

  • Sub consultancy Co-ordinator for the Center for Engineering & Technical Studies/ Lahmeyer International, RAHAD II IRRIGATION PROJECT + KENANA IRRIGATION PROJECT Sudan.
  • Abujanzeir Tower Commercial Technical & Economical Feasibility Study (25 Million $) – Alwgaf Alaslamia for Islamic Development Bank, Oct 2008.
  • Arbab Alterhab Agriculture and Animal Production Project Techno Economical Feasibility Study and Environmental Study October 2008
  • Bitar Building Asset Evaluation (3 Million $) October 2008.
  • Juba Aggregate Crusher Asset Evaluation & Operational Feasibility Study, Kenya Commercial Bank September 2008.
  • -Amarat Commercial Tower, Client Althagib Investment Company, Techno Economical Feasibility Study, September 2008.
  • Almagzoub Organization for the service of the Holy Quran Endowment Towers (6 Million $), Oct 2008. Awarded 4 Million Dollars by Islamic Development Bank, Saudi Arabia.
  • Re Evaluation of El Nilien Industrial Development Bank Group Fixed Asset (18.7 Million $), Under Evaluation (Previous Evaluations January 2007 & October 2005 Conducted by KCD)
  • 4 Star hotel, Kassala (3 Miilion $ ), Students Support Fund (In corporation with Dar Consult.
  • A Techno Economical Feasibility Study for an Autoclaved Aerated Concrete Plant (= 20 Million Dollars), July 2008. Client: Ajial Company (Army Housing)
  • A Techno Economical Feasibility Study for an Ready Mix Plant (= 5 Million Dollars), May 2008. Client: Ajial Company (Army Housing)
  • A Techno Economical Feasibility Study for an Contracting company (= 3 Million Dollars), March 2008. Client: Ajial Company (Army Housing)
  • A Techno Economical Feasibility Study for a Lime Production Facility (= 7Million Dollars), March 2008. Client: Private Clients
  • A Techno Economical Feasibility Study for a logistics Company (= 12 Million Dollars), May 2007. Client: Private Clients
  • Tanks Market Study- private clients , May 2008.
  • Evaluation of Poultry Farm Fixed Assets (>50 Million $), Client Arif Group, May 2008.
  • Alraki Real Estate Project (60 Million $), Client Albarka Bank Feasibility Study, May 2008.
  • Evaluation of Public corporation for for Irrigation Fixed Asset Evaluation (>60 Million $), Client: Social Security Investment Authority, May 2008.
  • Shakri Alnajar Commercial DevelopmentTechnical & Economical Feasibility Study (3.5 Million $) – Alwgaf Alaslamia, April 2008.
  • Buukwaan Commercial Development Technical & Economical Feasibility Study (3Million $) – Alwgaf Alaslamia, , April 2008.
  • Evaluation of Sanabil National Corp. Fixed Assets (7 Million $), March 2008.
  • Private Schools Investment Technical & Economical Feasibility Study (3Million $) – Algazeera Private Schools, , March 2008.
  • Evaluation of Aljazeera Tannery Corporation Fixed Asset (12 Million $), February 2008.
  • Evaluation of Private Air Cooler Factory Fixed Assets (1 Million $) February 2008.
  • Ministry of Justice, Real Estate Investment, Plots Potential Appraisal, January 2008.
  • Herbal Medicines Pharmaceutical Complex (10 Million $), Central Medical Supplies Corporation, December 2007.
  • Darfor Transitional Government, Housing Projects Assessment Study, December 2007.
  • Alawgaf Alaslamia Alferdos Residential Project (Alamarat) Feasibility Study, Design and Supervision, November 2007.
  • Students Fund Trust TowerTechno Economical Feasibility Study Students Fund Trust (10 Million $), July 2007.
  • Alwagaf Alaslamia Project Development Company Techno Economical Feasibility Study (20 Million $) A Joint Venture between Alwgaf Alaslamia Sudan and Alwgaf Alslamia Qatar, May 2007
  • A Techno Economical Feasibility Study for a ready mixed plant (= 4 Million $). Client: Katio Construction March 2007.
  • Re-Evaluation of El Nilien Industrial Development Bank Group fixed Asset (18.5 Million $), February 2007.
  • A Techno Economical Feasibility Study for 4G Wireless Telecommunication Services (= 1 Million $), owner: 4G Networking Solutions; February 2007.
  • A Techno Economical Feasibility Study for An integrated Pharmaceutical Factory (= 50 Million $), owner: Central Medical Supplies; February 2007.
  • A Techno Economical Feasibility Study for 4U Business Services Center (= 0.5 Million $), owner: Samarec Engineering; January 2007.

2006

  • Sub consultancy Co-ordinator Center for Engineering & Technical Studies / Lahmeyer International, Merowe Irrigation Project, Sudan. The center is a sub consultant to Lahmeyer International in Sudan largest project to date Merowe Dam (1.2 Billion Dollars project).
  • A Parking Study for Central Khartoum. Client: Samarec Engineering, May 2006.
  • Project Management for 91 Km Alshook Ambrakein Road. Project Value 38 Million Dollars, Client: Danfodio Construction Company.
  • Project Management for Almkabrab Agriculture Project 60,000 Acres. Project Value 12 Million Dollars, Client: Danfodio Construction Company.
  • Project Management for ComputerMan Future University 23,000 m2 Project Value 30 Million Dollars, Client: Danfodio Construction Company.
  • A Techno Economical Feasibility Study for an Aerial Photography & GIS Center (= 2.5 Million Dollars), March 2006. Client: Private Clients.
  • Evaluation of Sudanese River Transport Company fixed Asset (=10 Million $), May 2006 (With Ernest & Young, ).
  • Completing a feasibility study far Alrakhi Luxury Real Estate Development (= 14.5 Million Dollars), March 2006. Client: Attwar Development
  • A Techno Economical Feasibility Study for NDT Testing ServicesCenter (= 1Million Dollars), March 2006. Client: Private Clients
  • Feasibility Study for a Small Water Bottling Plant Client: Hani Engineering Project Value: 300, 000$, January 2006.
  • The Techno-Economical feasibility study of establishing a new construction of Faculty of Family Sciences, Omdurman (= 3 Million $); March, 2006 Owner: Omdurman Islamic University.

2005

  • A Techno Economical Study for the development for Charity buildings around Sudan. Client: Alzubair Charity Fund, December 2005.
  • Evaluation of El Nilien Industrial Development Bank Group fixed Asset (16.5 Million $), October 2005
  • Evaluation of the Bids Submitted for the Supply, Installation and Commissioning of an Automated Distribution System for the Central Medical Supplies Corporation New Ware House (= 1.5 Million$), August 2005.
  • The Techno-Economical feasibility study of establishing a Steel Rod Factory (= 7 Million $); Jan.2005, Private Client.
  • A Veterinary Pharmaceutical Factory (= 20 Million $), owner: Central Medical Supplies; Dec,2004.
  • The Techno-Economical feasibility study of establishing a new university specilising in Islamic Hadith, Khartoum North (= 27 Million $); Feb, 2005. Owner: Sudanese & Gulf Doners.
  • Aldoha Hotel Acquisition Feasibility Study for Kuwaiti Patients Support Fund (Project Value 1.5 Million $), August 2005.
  • Asset Evaluation & Real Estate Development Feasibility Study for Kuwaiti Patients Support Fund (Project Value 1.7 Million $), August 2005.
  • Asset Evaluation & Real Estate Development Feasibility Study for Almamoura Residential Building Client: Kuwaiti Patients Support Fund. Project Value: 1.5 Million $, September 2005.
  • The Techno-Economical feasibility study of establishing a new construction of Faculty of Education, Omdurman (= 5 Million $); Feb, 2005 Owner: Omdurman Islamic University.
  • The Techno-Economical feasibility study of establishing a new construction of Faculty of Medical Labratories, Omdurman (= 8 Million $); Feb, 2005 Owner: Omdurman Islamic University.

2004

  • A techno Economical Feasibility Study (Boot System) for East Khartoum Sewage Network and Treatment Plant (Client: Ebd Group Lebanon).
  • Reorganization of Sherian Alshimal Holding Company
  • Evaluating the Fixed Assets of Selsebeel Pharmaceutical Factory (= 6 Million$); Dec, 2004.
  • Evaluating the Fixed Assets of Affra Shopping Mall (30 Million $); Nov, 2004.
  • Techno – Economical Feasibility Study for a new resort Hotel in Soba (= 3 Million $), August 2004 Owner: Pert Project Development
  • Feasibility Study for a new Wireless ISP (= 1.5 Million $), May 2004 Client: Jet Net kawtia Building
  • Evaluating the Fixed Assets of Auto-Land Car and Office Building (=1.5 Million $); Nov, 2004.
  • The Techno-Economical feasibility study of establishing a new construction of Faculty of Engineering Sciences, Omdurman (= 10 Million $); Feb, 2004. Owner: Omdurman Islamic University.
  • Design, Tendering & Supervision for:

o   Ashrafcom Towers (11 Floors) Amarat , [Under Construction 10 th Floor] , Khartoum 2

o   Residential Flat towers in 43 street, Saba Towers (10 Floors) Amarat , [Under Construction Frame Complete]

o   Residential Flat towers in Elriad, Makka Towers (13 Floors) Amarat , [Under Construction 3rd Floor]

o   Residential Flat towers in Altaif (12 Floors) Amarat , [Under Construction 9th Floor]

2003

  • Feasibility Study for a new 4000 Ton/Day Cement Plant (Atbara) Client: Masa Engineering Completed January 2003.
  • Feasibility Study for Sudan – Ethiopia Oil Transmission Pipeline Client: Masa Engineering Investment Group Completed July 2003.
  • The Techno-Economical feasibility study of Masa Iron Ore Mining & Steelmaking Factory (= 70 Million $); Kht. Aug 2003 Owner: Masa Holding Group.
  • The feasibility study of Tala Agriculture Scheme (= 71 Million $) Owner: “Suadi Arabia Investors”; Nahr Elnile State.June, 2003.
  • Tendering, Design and Supervision of a RO unit in Heglig (GNPOC) In cooperation with Medco (Masa Engineering) [Awtad Consultancy].
  • Planning of Alsalam City (600 Acres, Soba)
  • Fixed Telecom Operator Business Plan (Ashraf Communication bid for the tender)
  • Feasibility Study for a New business Informatics College, Client Smart Step, Khartoum.

2002

  • A complete Techno – Economical feasibility study was completed for Triaq Pharmaceutical Complex (Currently Under Construction under the Name Ain Sudan, Gadida Althawra . The study was revised, with minor modification, and approved by Pharma Plan, Germany. The study formed the basis for the project, Construction has just been initiated (Client: Pharmaceutical Supply Corporation) [Awtad Consultancy].
  • All the infrastructure setup (Electrical utilities, water supply, tanks, sewers, gates …etc) for the above complex was detailed designed and tendered. The tender was awarded in November 2002. (Client: Pharmaceutical Supply Corporation) [Awtad Consultancy].
  • Design and tender documents for the above complex production areas, Administration buildings, R&d, Pharmaceutical College … etc. (Client: Pharmaceutical Supply Corporation) [Awtad Consultancy].
  • Project Appraisal for Sudan electronic city, a high technology zone (Client: Science and Technology Ministry/ Council of Ministers) [Awtad Consultancy].
  • Planning for the electronic city proposed site in Alshagra, Khartoum (Client: Science and Technology Ministry) [Awtad Consultancy].
  • A complete Techno – Economical feasibility study and design for Atbara Portsudan 200,000 m3/day Water Pipeline (Client: Red Sea State Government) [Awtad Consultancy].
  • Cooperation in the Tender for a new water desalination 10,000 m3/day Plant in Port Sudan (Client: Ebd Group Lebanon/ Masa Investment Group) Tender Won. Plant Opening January 2004 [Awtad Consultancy].
  • A complete Techno – Economical feasibility study was completed for Sudan New International Airport in Gadida Althawra (Client: Gezira State Government). [Awtad Consultancy].
  • Feasibility Study for a steel fabrication workshop & Auto claved Aerated Concrete Plant (Client: a consortium led by Masa Investment group) [Awtad Consultancy].
  • Pre feasibility Study for an investment Bank (Client: a consortium led by Masa Investment group) [Awtad Consultancy].
  • Business Plan for a Second GSM Licence in Sudan (Client: A Gulf Sudanese Consortium). [Awtad Consultancy].
  • Business Plan for a Sudan Airways Privatization Bid (Client: A Gulf Chinese Sudanese Consortium) [Awtad Consultancy].
  • Conceptual Design for the development Alingaz Bridge Gardens, Omderman Side (Client: Private Consortium) [Awtad Consultancy].

2001

  • Feasibility Study for the great Northern Projects, which include Mining, roads, industrial projects ..etc (Client: Northern State Government/ Nile State Government) [Awtad Consultancy].
  • Pre Feasibility Study and Preliminary Design For a New Pharmaceutical Complex (Client: Pharmaceutical Supply Corporation) [Awtad Consultancy].
  • Feasibility Study for a new 4000Ton/Day Cement Plant, Atbara (Client: Medco company) [Awtad Consultancy].
  • Pre-feasibility and preliminary design for Atbara – Port Sudan Pipeline (Client: Red Sea State Government) [Awtad Consultancy].
  • Pre-Feasibility and preliminary planning for a new Airport in ELGedida Elthwara (Client: Gezira State Government) [Awtad Consultancy].

1990-2000

  • Completed a short contract for the Tsing Ma Bridge Arbitration in Hong Kong preparing a report on the optimum mix design for the bridge based on analysing data from the literature (as part of the Concrete Durability Group, Imperial College, UK Tel: +44 (0)207 5945955)
  • Completed a short contract for Building Research Establishment (BRE) analysing data from a natural exposure trial in Bahrain (as part of the Concrete Durability Group, Imperial College, UK)

Also, participated in consultancy service in Asset Evaluation, deterioration of reinforced concrete structures, the use of alternative building materials, Portland Cements, Computer Applications & Data Analysis (1996-Now)