{"id":45,"date":"2016-11-23T07:01:10","date_gmt":"2016-11-23T07:01:10","guid":{"rendered":"http:\/\/staffpages.uofk.edu\/mohamed-ahmedadam\/?page_id=45"},"modified":"2016-11-23T07:01:10","modified_gmt":"2016-11-23T07:01:10","slug":"experience-record-2","status":"publish","type":"page","link":"https:\/\/staffpages.uofk.edu\/mohamed-ahmedadam\/?page_id=45","title":{"rendered":"Experience Record"},"content":{"rendered":"<p>Project Manager For Rehabilitation Of Sewage Treatment Plant (Sbr System) For Khartoum State Waste Water Corporation Of Capacity 17000 Cum\/D ( Mena \u2013Water U A E Main Contractor (2010 To Date).<\/p>\n<p>Project Manager For Rehabilitation Of Water Treatment Plant For Khartoum State Water Corporation Of Capacity 300000 Cum\/D ( Mena-Water Uae Main Contractor ) (2010 To Date)<\/p>\n<p>Design Of Water Treatment Facilities For Rural And Nomad Communities In Northern Kordofan State In The Water Harvesting Projects (Water Impounding Reservoirs ( Haffirs) ) Financed By Dam Implementation Unit\u00a0\u00a0 2010\/2011<\/p>\n<p>Design Of Geili Waste Water Treatment Plant 2006\/007.<\/p>\n<p>Design Of El Obeid Water Treatment Plant From White Nile 2006\/S007.<\/p>\n<p>Design Of Water Supply Project For Ethiopia Town, Kibre Mengist 2006\/2007<\/p>\n<p>Design Of Water Supply And Sanitation System For Marawai Dam Project 2006\/2007.<\/p>\n<p>Water Supply &amp; Wastewater System For Heart Hospital At Wad Medani 2006\/2007<\/p>\n<p>Water Supply &amp; Waste Water Project For Thar Jath Hospital<\/p>\n<p>2002-To 2006 &#8211; Design And Supervision Of Kenana Sugar Township And Factory Sewerage System (60,000m<sup>3<\/sup>\/D).<\/p>\n<p>&#8211; Design Of Sewerage Project For Khartoum Refinery Company At El Geili (1800<sup>3<\/sup>\/D).<\/p>\n<p>&#8211; Design And Supervision Of Sewerage Project For Oil Factory (Safola) At Khartoum.<\/p>\n<p>&#8211; Design Of Sewerage System For Gnpoc Pumping Stations.<\/p>\n<p>&#8211; Design Of Sewerage System For Merowi Dam Residential Camp.<\/p>\n<p>&#8211; Design Of Sewerage System For Five Towns In Losetho (South Africa)<\/p>\n<p>&#8211; Design And Supervision Of Water Supply And Sewerage System Load Dispatch Centre (Ldc), National Electricity Co-Operation (Ntc).<\/p>\n<p>-Environmental Impact Assessment For Dust Particulate Effects On Merowi Turbine Units.<\/p>\n<p>-Design And Supervision For Water Supply And Sanitation System For Residential Complex Of Ntc At Geri (Geili)<\/p>\n<p>&#8211; Water Supply And Sanitation System For The Master Plan Of White Nile Sugar Project.<\/p>\n<p>1996 \u2013 2002\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Senior Consultant, Water &amp; Sanitary Engineering, .<\/p>\n<p>Responsible For Design And Construction Supervision Of Water Distribution And Sanitation For Various Industrial And Building Projects Such As:<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0 Arab Sudanese Vegetable Oil &amp; Soap Project.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0 Sudanese Korean Vocational Training Centre.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0 White Nile River Front Development Project.<\/p>\n<p>&#8211;\u00a0 Kenana Factory And Township Development Plan Project.<\/p>\n<p>&#8211;\u00a0 El Roubi Agricultural Production Township And Factory.<\/p>\n<p>&#8211;\u00a0 Master Plan For Towns Of Southern Kordofan State.<\/p>\n<p>&#8211;\u00a0 Gnpoc Projects At Heglig , Geili And Headquarter.<\/p>\n<p>&#8211;\u00a0 Portsudan. El Obeid, El Fasher ,Omdurman Water Supply Projects.<\/p>\n<p>&nbsp;<\/p>\n<p>1994 \u20131996\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Expert ,Arab Bank For Economic Development In (Badea), Waste Water Authority, Mauritius.<\/p>\n<p>Responsible For:<\/p>\n<p>(One) Managing And Organising The Following Major Sewerage Projects In Study, Design, Tender Documents And Implementation Stages:<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0 Urgent Improvement Works For Existing Sewerage Facilities In Urban Areas Of Mauritius (Project Value Us$ 12 M).<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0 New Sewerage Facilities For Tourist Resort At Grand Baie (Pv = Us$ 20m).<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0 Sewerage Facilities At Baie Du Tombeau Area Comprising Pumping Stations, Sewer Networks, Treatment Plant And Marine Outfall (Pv = Us$ 10 M).<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0 Extension Of Treatment Plant At St. Maartin To Tertiary Level Including Irrigation Systems (Pv = Us$ 27 M).<\/p>\n<p>&nbsp;<\/p>\n<p>(Two) Supervising The Pollution Control Unit Where Effective Monitoring Is Required To Control The Discharge Of Waste Water To Sewers, Rivers And Water Courses In Order To Secure Compliance With Required Effluent Standards.<\/p>\n<p>&nbsp;<\/p>\n<p>(Three) Reviewing Environment Impact Assessment (Eia) Reports For Different Undertakings In The Country.<\/p>\n<p>&nbsp;<\/p>\n<p>1991 \u2013 1994 Associate Professor , Civil Engineering Department, University Of Khartoum.<\/p>\n<p>(One) \u00a0 Associate Professor For Environmental Engineering In The Civil Engineering Departments For Both Undergraduate And Graduate Courses.<\/p>\n<p>&nbsp;<\/p>\n<p>(Two) Consultant For The Wet Utilities Of The University Of Khartoum And Other New Universities Compounds.<\/p>\n<p>( C ) Being Associated With Private Firms For Some Major<\/p>\n<p>Projects Such As:<\/p>\n<p>&nbsp;<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0 Community Water Supply And Sanitation Project For Rural Areas Of Khartoum Sponsored By World Health Organisation.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0 Design And Supervision Of Water And Drainage Systems For Multi-Storey Buildings In Khartoum Including Hospitals, Banks And Other Commercial Complex.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0 Consultant Of Wet Utilities For Arab Organisation For Agricultural Development Building.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0 Consultant With Kuljian From U.S.A. For The Study Of Desalination Plant For Port Sudan.<\/p>\n<p>&nbsp;<\/p>\n<p>1988 \u2013 1991\u00a0\u00a0 Expert, High Commission For Development Of City Of Riyadh-Saudi Arabia.<\/p>\n<p>&nbsp;<\/p>\n<p>One) \u00a0\u00a0 Task Leader For The Team Responsible To Assess The Municipal Infrastructures As Far S The Wet Utilities Were Concerned And The Current Water Use Practices For The City Of Riyadh. The Work Covered The Following Aspects:<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0 Leakage Tests And Assessment Form Drinking Water Networks.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0 Infiltration From Foul Water Sewers And Storm Water Sewers Into Sub-Soil Strata.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0 Aspects Of Domestic Water Conservation And Preventive Programmes For Solving The Rising Groundwater In The City.<\/p>\n<p>&nbsp;<\/p>\n<p>Two) Task Leader For Water Quality Programme And Co-Ordinator For Water Resources Management For Wadi-Hanifah Catchment Area.<\/p>\n<p>&#8211; Reviewer (To Date) For The Research Study Projects Of Wet Utilities In Saudi Arabia Sponsored By King Abdul Aziz City For Science And Technology In Riyadh.<\/p>\n<p>&nbsp;<\/p>\n<p>1980 &#8211; 1988\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Lecturer And Consultant, Civil Engineering Department,<\/p>\n<p>University Of Khartoum And Associated With Local Engineering<\/p>\n<p>&nbsp;<\/p>\n<p>1979 &#8211; 1980\u00a0\u00a0\u00a0\u00a0 Project Manager, Concorp, International Kampala, Uganda.<\/p>\n<p>&nbsp;<\/p>\n<p>1975 \u2013 1979\u00a0\u00a0\u00a0\u00a0 Senior Engineer, National Urban Water Corporation, Khartoum.<\/p>\n<p>&nbsp;<\/p>\n<p>1971 &#8211; 1975\u00a0\u00a0\u00a0\u00a0 Assistant Engineer, National Urban Water Corporation, Khartoum.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Manager For Rehabilitation Of Sewage Treatment Plant (Sbr System) For Khartoum State Waste Water Corporation Of Capacity 17000 Cum\/D [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"page-publications.php","meta":{"footnotes":""},"class_list":["post-45","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/staffpages.uofk.edu\/mohamed-ahmedadam\/index.php?rest_route=\/wp\/v2\/pages\/45","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staffpages.uofk.edu\/mohamed-ahmedadam\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/staffpages.uofk.edu\/mohamed-ahmedadam\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/staffpages.uofk.edu\/mohamed-ahmedadam\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/staffpages.uofk.edu\/mohamed-ahmedadam\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=45"}],"version-history":[{"count":1,"href":"https:\/\/staffpages.uofk.edu\/mohamed-ahmedadam\/index.php?rest_route=\/wp\/v2\/pages\/45\/revisions"}],"predecessor-version":[{"id":47,"href":"https:\/\/staffpages.uofk.edu\/mohamed-ahmedadam\/index.php?rest_route=\/wp\/v2\/pages\/45\/revisions\/47"}],"wp:attachment":[{"href":"https:\/\/staffpages.uofk.edu\/mohamed-ahmedadam\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=45"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}