{"id":45,"date":"2017-12-13T12:09:48","date_gmt":"2017-12-13T12:09:48","guid":{"rendered":"http:\/\/staffpages.uofk.edu\/ibrahim2\/?page_id=45"},"modified":"2017-12-13T12:09:48","modified_gmt":"2017-12-13T12:09:48","slug":"45","status":"publish","type":"page","link":"https:\/\/staffpages.uofk.edu\/ibrahim2\/45\/","title":{"rendered":""},"content":{"rendered":"<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Urban Planning Consultant and Project Manager\u00a0\u00a0 \u00a0June, 2017- To date<\/span><br \/>\n<span style=\"font-family: times new roman, times; font-size: 14pt;\">Project; Surface Drainage Master Plan for El-Obeid city- North Kordufan State, Sudan. University of Khartoum Consultancy Corporation<\/span><br \/>\n<span style=\"font-family: times new roman, times; font-size: 14pt;\">Urban Planning Consultant and Project Manager\u00a0\u00a0 \u00a0June, 2015- To date Project; The Strategic Structure plan for El-Obeid City and the Master plan for the city center\u2013 North Kordufan State. Sudan.<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">University of Khartoum Consultancy Corporation<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Urban Design and Community Participation Consultant\u00a0\u00a0 \u00a0April, 2015- To date<\/span><br \/>\n<span style=\"font-family: times new roman, times; font-size: 14pt;\">Project; The Strategic Structure plan for Al-damazin and Alroseris cities- Blue Nile State<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Joint project with UN-Habitat, University of Khartoum and Blue Nile State<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Urban Planning Expert, Murtada Maaz Consults\u00a0\u00a0 \u00a0Sep. 2013 \u2013 May 2014<\/span><br \/>\n<span style=\"font-family: times new roman, times; font-size: 14pt;\">Current Project: Site selection for El-Obeid Medical City Project<\/span><br \/>\n<span style=\"font-family: times new roman, times; font-size: 14pt;\">Developed criteria, tools and methods necessary to select the appropriate site of the proposed El-Obeid Medical City (North Kordufan State) using Multi-Criteria Evaluation (MCE), analytical hierarchical process (AHP) and GIS modeling. The project cost is 100 Million USD.<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Waseda University, Ariga Laboratory, Tokyo, Japan\u00a0\u00a0 \u00a0April 2010 \u2013 To Sep. 2011<\/span><br \/>\n<span style=\"font-family: times new roman, times; font-size: 14pt;\">Komagome Urban Development Project. Komagome, Tokyo, Japan.<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">The project aims to improve the urban conditions of Komagome area in Tokyo through community participation. This project adopted the concept of citizens\u2019 made master plan.<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Actively participated in designing and conducting the participatory workshops related to this project.<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">University of Khartoum Consulting Corporation (UKCC), Khartoum, Sudan\u00a0\u00a0 \u00a0June 2007-Feb. 2008<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Soba Land Investment Project<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Coordinator and chief planner of the design team in charge of urban planning and design potentials of<\/span><br \/>\n<span style=\"font-family: times new roman, times; font-size: 14pt;\">University of Khartoum lands in Soba. Project Area 87.5 Hectare.<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Itgan Engineering and HLE-BWM-SP Consortium, Khartoum, Sudan\u00a0\u00a0 \u00a0March 2005- Dec. 2005<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Chief Planner\/Architect for THARJATH Oil Field Development project<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Prepare general layout plans, building designs and details according to PETRONAS ITB, prepare working drawings, and assist quantity surveyors to prepare bills of quantity, help in procuring building materials and components).<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Karplen Consultancies, Khartoum, Sudan\u00a0\u00a0 \u00a0May 2006- July 2006<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Urban Planner<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Extensive involvement in the preparations of the general layout plans for White Nile Sugar Company Main<\/span><br \/>\n<span style=\"font-family: times new roman, times; font-size: 14pt;\">Township and two major villages.<\/span><br \/>\n<span style=\"font-family: times new roman, times; font-size: 14pt;\">\u00a0<\/span><br \/>\n<span style=\"font-family: times new roman, times; font-size: 14pt;\">Itgan Engineering &amp; Petro-Help for Engineering Services, Khartoum, Sudan\u00a0\u00a0 \u00a0Sep. 2006- July 2007<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Senior Planner\/ Architect for several Bioremediation Projects.<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Institute of Urban Studies, University of Khartoum, Khartoum, Sudan\u00a0\u00a0 \u00a0Sep. 2006- Nov. 2006<\/span><\/p>\n<p><span style=\"font-family: times new roman, times; font-size: 14pt;\">Capacity building in environmental management for River Nile state. Ministry of planning and public utilities, River Nile state.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Urban Planning Consultant and Project Manager\u00a0\u00a0 \u00a0June, 2017- To date Project; Surface Drainage Master Plan for El-Obeid city- North Kordufan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"page-publications.php","meta":{"footnotes":""},"class_list":["post-45","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/staffpages.uofk.edu\/ibrahim2\/wp-json\/wp\/v2\/pages\/45","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staffpages.uofk.edu\/ibrahim2\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/staffpages.uofk.edu\/ibrahim2\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/staffpages.uofk.edu\/ibrahim2\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/staffpages.uofk.edu\/ibrahim2\/wp-json\/wp\/v2\/comments?post=45"}],"version-history":[{"count":1,"href":"https:\/\/staffpages.uofk.edu\/ibrahim2\/wp-json\/wp\/v2\/pages\/45\/revisions"}],"predecessor-version":[{"id":47,"href":"https:\/\/staffpages.uofk.edu\/ibrahim2\/wp-json\/wp\/v2\/pages\/45\/revisions\/47"}],"wp:attachment":[{"href":"https:\/\/staffpages.uofk.edu\/ibrahim2\/wp-json\/wp\/v2\/media?parent=45"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}