{"id":47,"date":"2016-12-04T09:01:02","date_gmt":"2016-12-04T09:01:02","guid":{"rendered":"http:\/\/staffpages.uofk.edu\/gamaleldin-murtada\/?page_id=47"},"modified":"2016-12-04T09:01:02","modified_gmt":"2016-12-04T09:01:02","slug":"examples-of-consultancy-projects-technical-reports","status":"publish","type":"page","link":"https:\/\/staffpages.uofk.edu\/gamaleldin-murtada\/?page_id=47","title":{"rendered":"Examples of Consultancy Projects &#038; Technical Reports"},"content":{"rendered":"<p>2012 &#8211; Present\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Study and Design of Water Harvesting Projects Associated with the Upper Atbara Dam Complex (With University of Khartoum Consultancy Corporation, UKCC).<\/p>\n<p>&nbsp;<\/p>\n<p>2012 &#8211; Present\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Study and Design of Irrigation Schemes Associated with Kajbar Dam, (With UKCC).<\/p>\n<p>2012\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Design of Water Supply System for a number of villages in Kassala State, for Red Sea Corporation.<\/p>\n<p>2011\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Design of Water Supply Systems for Borgaig Locality, Northern Sudan, Ministry of Planning and Public Utilities, Northern State<\/p>\n<p>2010-2011\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Development and operation of an Early Warning and Flood Forecasting System for the Nile, Ministry of Water Resources and Electricity.<\/p>\n<p>2009 &#8211; 2011\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Study and Design of Water Supply Schemes for new settlements Associated with the Heightening of Roseris Dam, (With UKCC).<\/p>\n<p>2009 &#8211; 2011\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Study, Design and Supervision of Construction of Water Harvesting projects of North Kordofan, (With UKCC).<\/p>\n<p>&nbsp;<\/p>\n<p>2010 &#8211; 2011\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Hydraulic Studies for the Design of the following Bridges; Dongola, Al Dabba, Addubaseen, and Tuti &#8211; Bahari Bridges<\/p>\n<p>2005 &#8211; 2009\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Hydraulic Studies and Design of Drainage Structures of a Number of Higways, namely, Khartoum \u2013 Dongola \u2013 Halfa, Khartoum \u2013 Atbara and Atbara \u2013 Marawe.<\/p>\n<p>2002 \u2013 2007\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Study and Design of Irrigation Schemes Associated with Marowe Dam, (With UKCC).<\/p>\n<p>1995-1997\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Water Resources Assessment and Management in Gedarif Area ,Eastern Sudan, , for the Ministry of Engineering Affairs, Gedarif State, Sudan.<\/p>\n<p>2002\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Design of Pumping Station for Multaga Irrigation Scheme, for Khartoum University Consultancy Corporation (UKCC) (2002)<\/p>\n<p>1998-1999 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Design of Abu Delaig Earth Dam, UKCC, For the Ministry of Agriculture and animal,<\/p>\n<p>1999-2000 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Water Resources Development of Wadi Moj and Wadi Salalab, to supplement Port Sudan water supply, For Red Sea Water Corporation,<\/p>\n<p>1999. \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Study of the Effect of Sediment Load of River Mog on the proposed new harbors, Port Sudan, for Sea Port Coropration,<\/p>\n<p>1995-1999\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Water Resources Assessment and Management in Gedarif Area ,Eastern Sudan, , for the Ministry of Engineering Affairs, Gedarif State, Sudan.<\/p>\n<p>1992-1993 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Evaluation of the performance of 50 water supply stations (Groundwater) along the cattle road, 800 Km long from western Sudan to Khartoum, for Project Preparation Unit, Ministry of Finance and economic Planning, Department of Privatization of Public Enterprises.,<\/p>\n<p>1992-1993 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Evaluation of the Irrigation Scheme associated with COCO diary factory, Khartoum, for Project Preparation Unit, Ministry of Finance and economic Planning, Department of Privatization of Public<\/p>\n<p>1986-1989 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Design of water supply and sanitation systems in a number of university complexes, University of Khartoum, Sudan, for Chief Engineer&#8217;s Office, Khartoum University.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>2012 &#8211; Present\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Study and Design of Water Harvesting Projects Associated with the Upper Atbara Dam Complex (With University of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"page-publications.php","meta":{"footnotes":""},"class_list":["post-47","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/staffpages.uofk.edu\/gamaleldin-murtada\/index.php?rest_route=\/wp\/v2\/pages\/47","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staffpages.uofk.edu\/gamaleldin-murtada\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/staffpages.uofk.edu\/gamaleldin-murtada\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/staffpages.uofk.edu\/gamaleldin-murtada\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/staffpages.uofk.edu\/gamaleldin-murtada\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=47"}],"version-history":[{"count":1,"href":"https:\/\/staffpages.uofk.edu\/gamaleldin-murtada\/index.php?rest_route=\/wp\/v2\/pages\/47\/revisions"}],"predecessor-version":[{"id":49,"href":"https:\/\/staffpages.uofk.edu\/gamaleldin-murtada\/index.php?rest_route=\/wp\/v2\/pages\/47\/revisions\/49"}],"wp:attachment":[{"href":"https:\/\/staffpages.uofk.edu\/gamaleldin-murtada\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=47"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}