{"id":42,"date":"2016-12-01T07:52:41","date_gmt":"2016-12-01T07:52:41","guid":{"rendered":"http:\/\/staffpages.uofk.edu\/babiker-ibrahim\/?page_id=42"},"modified":"2016-12-01T07:53:30","modified_gmt":"2016-12-01T07:53:30","slug":"professional-experience","status":"publish","type":"page","link":"https:\/\/staffpages.uofk.edu\/babiker-ibrahim\/?page_id=42","title":{"rendered":"Professional Experience"},"content":{"rendered":"<p>. Design of the&#8221; Rainfall Drainage Network for the National Capital(Khartoum, Omdurman &amp; Khartoum North )&#8221;,<\/p>\n<p><em>\u00a0\u00a0 Consulting Firm : <\/em>Agib-Howard Humpherys Joint Venture, 1991<\/p>\n<p>Client: Ministry of Engineering Affairs, Khartoum State<\/p>\n<p>&nbsp;<\/p>\n<p>2. Design of the&#8221; Drainage Structures for El-Renk \u2013 Malakal Road &#8220;, (330 km) ,1997<\/p>\n<p><em>Consulting Firm : <\/em>Stippe-Techncon Joint Venture<\/p>\n<p>Client: Ministry of Highways &amp; Transportation<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"3\">\n<li>Design of the&#8221; Drainage Structures for El-Renk \u2013 Jabalein l Road &#8220;, (158 km), 1998<\/li>\n<\/ol>\n<p><em>Consulting Firm : <\/em>Techncon<\/p>\n<p>Client: Ministry of Highways &amp; Transportation<\/p>\n<p>&nbsp;<\/p>\n<p>4. Design ,in participation with other colleagues, of the&#8221; Drainage Structures for En Nuhud-Rigl elFula-ElMuglad Road &#8220;, (230 km), as a consultant for University of Khartoum Consultancy Corporation ,1998<\/p>\n<p>Client: Ministry of Highways &amp; Transportation<\/p>\n<p>&nbsp;<\/p>\n<p>5. Design of the&#8221; Rainfall Drainage Network for Singa town&#8221;, as a consultant for El-Dar El-Estisharia<\/p>\n<p>Client: Ministry of Engineering Affairs, El-Gadarif State<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"6\">\n<li>Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of<\/li>\n<\/ol>\n<p>Tama Irrigation Scheme :This is a 6000 Feddan scheme on the Blue<\/p>\n<p>Nile near Karkooj (Blue Nile State), 1992<\/p>\n<p>Client: Ministry of Engineering Affairs, Sennar State<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"7\">\n<li>Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of Soba West Irrigation Scheme : This is a 2700 feddan Scheme on the Blue Nile, , 1990 .<\/li>\n<li>Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of Sanabil Scheme : This is a 22000 feddan scheme on the eastern bank of the Blue Nile near Um Dawanban (Khartoum State), 1993.<\/li>\n<\/ol>\n<p>Client: Khartoum University<\/p>\n<p>Client: Sanabil Cooperative Committee<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"9\">\n<li>Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of ElMultaga Agricultural Scheme : This is a 15000 feddan scheme on the eastern bank of the Blue Nile near El-Daba (Northern State),<\/li>\n<\/ol>\n<p><em>\u00a0\u00a0\u00a0\u00a0 Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p><em>\u00a0\u00a0\u00a0\u00a0 Client: Merowe Dam Project ImplementationUnit,1999.<\/em><\/p>\n<p>&nbsp;<\/p>\n<ol>\n<li>Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of Mokabrab Agricultural Scheme : This is a 60 000 feddan scheme on the eastern bank of the River Nile near ElDamar (Nile State),<\/li>\n<\/ol>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p><em>\u00a0\u00a0 Client: Merowe Dam Project ImplementationUnit, 2000.<\/em><\/p>\n<p><em>\u00a0<\/em><\/p>\n<ol>\n<li>Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of New Amri Agricultural Scheme : This is a 35000 feddan scheme on the western bank of the Blue Nile near Korti (Northern State),<\/li>\n<\/ol>\n<p><em>\u00a0\u00a0 Consulting Firm :University of Khartoum Consultancy Corporation<\/em><\/p>\n<p><em>\u00a0\u00a0 Client: Merowe Dam Project ImplementationUnit ,2003.<\/em><\/p>\n<p>&nbsp;<\/p>\n<ol start=\"2\">\n<li>Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of Kiheila Agricultural Scheme : This is a 45 000 feddan scheme on the eastern bank of the River Nile near Abu Hamad (Nile State),<\/li>\n<\/ol>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p><em> Client: Merowe Dam Project ImplementationUnit, 2005.<\/em><\/p>\n<p>&nbsp;<\/p>\n<ol start=\"3\">\n<li>Design, in participation with other colleagues, of \u201c El-Gadarif Water Supply Scheme\u201d,(1994) , which include the following :<\/li>\n<\/ol>\n<p>i) design of a 66 km long pipeline with a pump station<\/p>\n<p>ii) design of a water reservoir at the outfall of a small stream<\/p>\n<p>iii) design of an earth dam with deep sluices and a spillway<\/p>\n<p>Client: Ministry of Engineering Affairs, El-Gadarif State<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"4\">\n<li>&#8221; Design of Jabel Marra Hydropower &amp; Water Supply Scheme by utilizing three waterfalls in the Marra mountain\u201d,<\/li>\n<\/ol>\n<p>Client: Ministry of Engineering Affairs, South Darfur State<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>15. Development, in participation with other colleagues, of \u201c Ground Water Mathematical Model for El-Gadarif Aquifers\u201d ,(1997)<\/p>\n<p>Client: Ministry of Engineering Affairs, El-Gadarif State<\/p>\n<p>&nbsp;<\/p>\n<p>16. Design, in participation with other colleagues, of \u201c Wadi Gabatit<\/p>\n<p>(Red Sea State) Water Supply Scheme\u201d,(1997) , which inculde the<\/p>\n<p>following :<\/p>\n<p>i) design of a 15 km long pipeline<\/p>\n<p>ii) design of an underground dam<\/p>\n<p>iii) design of an earth dam with a spillway<\/p>\n<p>Client: Ministry of Engineering Affairs, Red Sea State<\/p>\n<p>&nbsp;<\/p>\n<p>17. Design, in participation with other colleagues, of \u201c Wadi Moj (Red Sea State) Water Supply Scheme\u201d,(1999) , which include the\u00a0\u00a0 following :<\/p>\n<p>i) design of a 12 km long pipeline<\/p>\n<p>ii) design of an earth dam with a spillway<\/p>\n<p>Client: Ministry of Engineering Affairs, Red Sea State<\/p>\n<p>&nbsp;<\/p>\n<p>18. Design,in participation with other colleagues, of \u201c Sudd El-Daiga (Khartoum State) Water Supply Scheme\u201d,(1999) , which inculdes<\/p>\n<p>the design of an earth dam with a spillway<\/p>\n<p>Consulting Firm : University of Khartoum Consultancy Corporation.<\/p>\n<p><em>Client: Ministry of Engineering Affairs, Khartoum State<\/em><\/p>\n<p>&nbsp;<\/p>\n<p>19. Design, in participation with other colleagues, of \u201c Wadi El-Mugadam (Khartoum State) Water Harvesting Scheme\u201d,(1999) , which inculdes the design of an earth dam with a spillway<\/p>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation. <\/em><\/p>\n<p>Client: Ministry of Engineering Affairs, Khartoum State<\/p>\n<p>&nbsp;<\/p>\n<p>20. Design ,in participation with other colleagues, of the Canalization System, Drainage System, Irrigation structures and Pump Stations of \u201cThe Bioremediation Project\u201d, at Hegleig Oil Field, <em> 2000.<\/em><\/p>\n<p><em>Consulting Firm : Solar Enterprises Company<\/em><\/p>\n<p>Client: Greater Nile Petroleum Operating Company<\/p>\n<p>21. Supervision of Construction of the Canalization System, Drainage System, Irrigation structures and Pump Stations of ElMultaga Scheme: This is a 15000 feddan scheme on the eastern bank of the Blue Nile near ElDaba (Northern State),<em> 2002.<\/em><\/p>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p><em>\u00a0\u00a0\u00a0\u00a0 Client: Merowe Dam Project ImplementationUnit.<\/em><\/p>\n<p><em>\u00a0<\/em><\/p>\n<p>22. Design ,in participation with other colleagues, of the Evaporation Ponds ,Canalization System, Drainage System, at Bamboo, Toma South, ElToor, ElHar-ElNar, Munga and Unity Oil Fields, <em> 2002.<\/em><\/p>\n<p><em>Consulting Firm : Solar Enterprises Company<\/em><\/p>\n<p>Client: Greater Nile Petroleum Operating Company<\/p>\n<p>23. Design ,in participation with other colleagues, of the Evaporation Ponds ,Canalization System, Drainage System, at Khartoum Refinery, <em> 2002.<\/em><\/p>\n<p><em>Consulting Firm : Techneco Group<\/em><\/p>\n<p>Client: Khartoum Refinery<\/p>\n<p>&nbsp;<\/p>\n<p>24. Project Manager for the Supervision of Construction of the Canalization System, Drainage System, Irrigation structures and Pump Stations of New Amri Scheme: This is a 35000 feddans scheme on the eastern bank of the River Nile near Korti (Northern State),<em> 2004-2007.<\/em><\/p>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p><em>\u00a0\u00a0\u00a0\u00a0 Client: Dams ImplementationUnit.<\/em><\/p>\n<p>25. Supervision of Construction of the Canalization System, Drainage System, Irrigation structures and Pump Stations of AlMokabrab Scheme: This is a 60000 feddans scheme on the eastern bank of the River Nile near AlDamer (Nile State),<em> 2004-2007.<\/em><\/p>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p><em>\u00a0\u00a0\u00a0\u00a0 Client: : Dams ImplementationUnit.<\/em><\/p>\n<p>&nbsp;<\/p>\n<p>26. Supervision of Construction of the Canalization System, Drainage System, Irrigation structures and Pump Stations of Kehaila Scheme: This is a 45000 feddans scheme on the eastern bank of the River Nile near Abu Hamad (Nile State),<em> 2006-2008.<\/em><\/p>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p><em>\u00a0\u00a0\u00a0\u00a0 Client: Dams ImplementationUnit.<\/em><\/p>\n<p><em>\u00a0<\/em><\/p>\n<p>27.\u00a0\u00a0 Hydraulic Design of the&#8221; Drainage Structures for Kadogli-Lagawa- AlFoola Road &#8220;, (170 km), 2006<\/p>\n<p><em>Consulting Firm : <\/em>Techno Group<\/p>\n<p>Client: Ministry of Highways &amp; Transportation<\/p>\n<p>28. Hydraulic Design of the&#8221; Drainage Structures for Kadugli \u2013 Higlieg Road with a length of 130 km and Mujlad \u2013 Abyei Road with a length of 220 km, 2009<\/p>\n<p><em>Consulting Firm : <\/em><em>Shouraconsult Company Ltd<\/em><\/p>\n<p>Client: Ministry of Highways &amp; Transportation<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>29. Team Leader for the \u201c Technical &amp; Financial Feasibility Study of Al-Roseiris Irrigation Scheme\u201d: This is a 200,000 feddans scheme on the eastern bank of the Blue Nile near Al-Roseiris (Blue Nile State), <em> 2009.<\/em><\/p>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p><em>\u00a0\u00a0\u00a0\u00a0 Client: Dams ImplementationUnit.<\/em><\/p>\n<p>30.\u00a0\u00a0 \u201cWater Resources Assessment (WRA) in Southern Sudan\u201d, <em>2010.<\/em><\/p>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p><em>\u00a0\u00a0\u00a0\u00a0 Client: Government of South Sudan.<\/em><\/p>\n<p>31. Team Leader for the \u201c Technical &amp; Financial Feasibility Study of Al-Shereik Irrigation Scheme\u201d: This is a 40,000 feddans scheme on the eastern bank of the River Nile near Al-Sherik ( Nile State), <em> 2010.<\/em><\/p>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p><em>\u00a0\u00a0\u00a0\u00a0 Client: Dams ImplementationUnit<\/em><\/p>\n<p><em>\u00a0<\/em><\/p>\n<p>32. Team Leader for the&#8221; Design of the Drainage Structures for Baleela-Um Adara Road &#8220;, (98 km), 2012<\/p>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p>Client: Petro-Energy Company<\/p>\n<p>&nbsp;<\/p>\n<p>33. Team Leader for the&#8221; Design of the Drainage Structures for For Block 6 (Jake-Keyi-Sentaya and Muglad) &#8220;, (84 km), 2013<\/p>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p>Client: Petro-Energy Company<\/p>\n<p>&nbsp;<\/p>\n<p>34. Project Manager for the Supervision of Construction of the<\/p>\n<p>&#8221; Drainage Structures for Baleela-Um Adara Road (Shalango Sector)&#8221;, EPCC Contractor: Sudan Pile -Jobdeliver, 2014-2015<\/p>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p><em>\u00a0\u00a0\u00a0\u00a0 Client: Petro-Energy Company<\/em><\/p>\n<p>&nbsp;<\/p>\n<p>35. Project Manager for the Supervision of Construction of the<\/p>\n<p>&#8221; Drainage Structures for Jake-Keyi-Sentaya and Muglad &#8220;,<\/p>\n<p>EPCC Contractor: Shandong, 2015.<\/p>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p><em>\u00a0\u00a0\u00a0\u00a0 Client: Petro-Energy Company<\/em><\/p>\n<p>36. Team Leader for the \u201c Technical &amp; Financial Assessment Study of The Existing Irrigation 58 Schemes in Northern State, Nile State &amp; Sennar State\u201d: Total Area is 657,000, <em> 2015.<\/em><\/p>\n<p><em>Consulting Firm : University of Khartoum Consultancy Corporation.<\/em><\/p>\n<p><em>\u00a0\u00a0\u00a0\u00a0 Client: Ministry of Finance<\/em><\/p>\n<p>37. Hydrologic and Hydraulic Design of the&#8221; Drainage Structures in Delta Toker Scheme, Red Sea State\u201d, 2015<\/p>\n<p><em>Consulting Firm : University of Khartoum Consultancy <\/em><\/p>\n<p>Client: Eastern Sudan Rehabilitation and Development Fund<\/p>\n","protected":false},"excerpt":{"rendered":"<p>. Design of the&#8221; Rainfall Drainage Network for the National Capital(Khartoum, Omdurman &amp; Khartoum North )&#8221;, \u00a0\u00a0 Consulting Firm : [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"page-publications.php","meta":{"footnotes":""},"class_list":["post-42","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/staffpages.uofk.edu\/babiker-ibrahim\/index.php?rest_route=\/wp\/v2\/pages\/42","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staffpages.uofk.edu\/babiker-ibrahim\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/staffpages.uofk.edu\/babiker-ibrahim\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/staffpages.uofk.edu\/babiker-ibrahim\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/staffpages.uofk.edu\/babiker-ibrahim\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=42"}],"version-history":[{"count":2,"href":"https:\/\/staffpages.uofk.edu\/babiker-ibrahim\/index.php?rest_route=\/wp\/v2\/pages\/42\/revisions"}],"predecessor-version":[{"id":45,"href":"https:\/\/staffpages.uofk.edu\/babiker-ibrahim\/index.php?rest_route=\/wp\/v2\/pages\/42\/revisions\/45"}],"wp:attachment":[{"href":"https:\/\/staffpages.uofk.edu\/babiker-ibrahim\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=42"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}